Tariff changes

We offer 11 exit services as reference services, all of which are described in the price list and related information

Reference tariff Reference service
A1 – Anytime energy (residential) exit service RT1
A2 – Anytime energy (business) exit service RT2
A3 – Time of use energy (residential) exit service RT3
A4 – Time of use energy (business) exit service RT4
A5 – High voltage metered demand exit service RT5
A6 – Low voltage metered demand exit Service RT6
A7 – High voltage contract maximum demand exit service RT7
A8 – Low voltage contract maximum demand exit service RT8
A9 – Streetlighting exit service RT9
A10 – Un-metered supplies exit service RT10
A11 – Transmission exit service TRT1
B1 – Distribution entry service RT11
B2 – Transmission entry service TRT2
C1 – Time of use (residential) bidirectional service RT12

How to apply

To apply for a new reference service (excluding CMD / DSOC) or modify an existing one (excluding CMD/DSOC) for a connection point:

  1. complete electricity transfer application - other services
  2. email the form in PDF format to retailer.applications@westernpower.com.au

For reference service eligibility criteria, refer to appendix 7 of the current Access arrangement.